Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the acf domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/u680641024/domains/devjdc.fr/public_html/ixans/wp-includes/functions.php on line 6131

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the astra-addon domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/u680641024/domains/devjdc.fr/public_html/ixans/wp-includes/functions.php on line 6131

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the astra-sites domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/u680641024/domains/devjdc.fr/public_html/ixans/wp-includes/functions.php on line 6131

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the unlimited-elements-for-elementor domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/u680641024/domains/devjdc.fr/public_html/ixans/wp-includes/functions.php on line 6131

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the tpebl domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/u680641024/domains/devjdc.fr/public_html/ixans/wp-includes/functions.php on line 6131

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the theplus domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/u680641024/domains/devjdc.fr/public_html/ixans/wp-includes/functions.php on line 6131

Notice: La fonction _load_textdomain_just_in_time a été appelée de façon incorrecte. Le chargement de la traduction pour le domaine astra a été déclenché trop tôt. Cela indique généralement que du code dans l’extension ou le thème s’exécute trop tôt. Les traductions doivent être chargées au moment de l’action init ou plus tard. Veuillez lire Débogage dans WordPress (en) pour plus d’informations. (Ce message a été ajouté à la version 6.7.0.) in /home/u680641024/domains/devjdc.fr/public_html/ixans/wp-includes/functions.php on line 6131
TUNNEL DE LA CROIX ROUSSE – LYON (69) pour aménagements intérieurs – Ixans
Deprecated: WP_Dependencies->add_data() est appelé avec un argument qui est obsolète depuis la version 6.9.0 ! Les commentaires conditionnels IE sont ignorés par tous les navigateurs pris en charge. in /home/u680641024/domains/devjdc.fr/public_html/ixans/wp-includes/functions.php on line 6131

TUNNEL DE LA CROIX ROUSSE – LYON (69) pour aménagements intérieurs

OPC

Le projet

Travaux d’équipements après percement d’un tunnel de circulation en mode doux et rénovation du tunnel routier existant. Longueur de chaque tunnel : 1 800 m.

La mission IXANS

Missions de suivi des études et des travaux d’aménagements intérieurs des tubes (éclairage, équipements, usines de ventilation, etc).

Maître d'ouvrage

GRAND LYON (69)

Notre client

Groupement VINCI / CEGELEC (69)

Montant des travaux

46 M€

Durée des travaux

20 Mois

Années de réalisation de la mission

2012 - 12/2013